News

The First Wind Farm of Hellenic Petroleum Renewable Energy Sources S.A. in operation

19/11/2013

The acquisition of Enrgeiaki Pylou-Methonis by Hellenic Petroleum Renewable Energy Sources S.A was completed on 15 November 2013. The former owns a 6.8 MW wind park in operation.
The wind park is located at Ag. Nikolaos, municipality Pylou-Nestoros, in Messinia. The project consists of 8 wind turbines G52/850 kW manufactured by Gamesa.
The energy production of the wind park is estimated to be 15.000 MWh annually and the reduction of CO2 emissions is at least 15.000 tons/year.
Photovoltaic parks in operation, Photovoltaic and Biomass projects under development of 200 MW total power are incuded in the renewables portfolio of Helenic Petroleum Renewable Energy Sources.

SUNSET AT PYLOS WIND PARK

More News